Submission Requirements

Podular Planning Guidance

Planning documentation checklist for minor residential development.


Core Submission Requirements

Always required: - Small Sites Metric (SSM) for <10 units

- BNG summary report

- Habitat map (existing/proposed)

- 30-year management plan (confirm LPA position — see 04 Pre App Strategy)

Portal requirements:

Conditional Requirements

Include if site-specific triggers apply:
DocumentTrigger
Tree Survey (BS 5837)Trees present or affected
Arboricultural Impact AssessmentTrees affected by development
Preliminary Ecological AppraisalEcological interest beyond BNG
Flood Risk AssessmentFlood zones 2 or 3
Air Quality AssessmentNear Clean Air Zone
Heritage Impact AssessmentHeritage assets affected
Ground Contamination AssessmentBrownfield / former industrial
Parking Management PlanShared parking proposed
Construction Management PlanAccess constraints / neighbour concerns
Transport StatementIf parking standards not met

Conservation Area Additional Requirements

If site is within a Conservation Area:


Design & Access Statement Contents

For minor development, the D&A can be concise but should include:

Tip: Combining Planning Statement and Residential Standards Statement into the D&A reduces document count without losing content.

Not Required for Minor Development

Unless specifically requested by LPA:

Reference: These are typically required for major development (10+ units or 0.5+ hectares). See Appendix B Lpa Variations for thresholds.

Quality Assurance Checklist

Before submission:

Post-Submission

Target timescales: Monitor:

Cross-References